Exploration Programs

Exploration Programs

Colomac Exploration

Drilling to Date

 

Drilling Highlights

2012 Highlights

Drill Hole From (m) To (m) Core Length1 (m) g/t Au
C12-01B 315.60 361.75 46.15 2.81
incl. 315.60 324.25 8.65 6.63
C12-10 243.75 252.75 9.00 8.86
C12-12B 358.25 364.80 6.55 16.65
C12-13B 254.50 277.25 22.75 3.43
incl. 258.75 268.95 10.20 6.25
C12-15 133.15 202.50 69.35 4.12
incl. 176.75 202.50 25.75 7.78
incl. 189.25 202.50 13.25 11.48

2014 Highlights

Drill Hole From (m) To (m) Core Length1 (m) g/t Au
C14-06 196.50 249.00 52.50 7.78
incl. 202.00 223.00 21.00 16.73
C14-04 286.50 306.75 20.25 1.79
incl. 286.50 297.75 11.25 2.86

 

342.25 365.50 23.25 1.66
incl. 355.75 365.50 9.75 3.09
  405.00 447.25 42.25 1.28
C14-02 254.00 279.00 25.00 2.38
incl. 267.25 276.00 8.75 4.98
C14-01B 278.50 304.75 26.25 1.74

2015 Highlights

Drill Hole From (m) To (m) Core Length1 (m) g/t Au
C15-04B 141.40 219.15 77.75 2.63
incl. 178.00 210.95 32.95 4.19
incl. 198.62 210.95 12.33 7.77
C15-05B 215.65 226.00 10.35 3.48
  269.00 290.50 21.50 2.32
incl. 284.50 289.75 5.25 6.91
C15-06 192.30 223.50 31.20 3.89
incl. 200.50 223.00 22.50 5.03
incl. 214.40 220.15 5.75 10.43

 

Maps and Sections

 

Goldcrest Exploration

 

2014 Drilling Highlights

6,038 total metres drilled

Drill Hole From (m) To (m) Core Length1 (m) g/t Au
G14-05 126.75 147.00 20.25 4.83
incl. 130.50 135.75 5.25 10.21
incl. 138.75 144.00 5.25 5.38
G14-04 103.40 123.00 19.60 4.19
incl. 112.75 120.65 7.90 7.85
G14-05B 183.25 203.00 19.75 2.25
incl. 184.75 190.75 6.00 6.34
G14-09 158.00 198.00 40.00 2.52
incl. 184.50 197.00 12.50 3.64
G14-08B 186.75 197.25 10.50 2.42

1Lengths are reported as core lengths. True widths are unknown at this time.

 

2014 Cross sections – Goldcrest

Holes G14-08 and 08B
G14-08 – 11.0m @ 2.15 g/t gold, incl 5.85m @ 3.39 g/t gold)

Holes G14-04 and 04B & G14-11 and 11B
(G14-04 – 19.60m @ 4.90 g/t gold, incl 7.90m @ 7.85 g/t gold)

Email Signup

Sign up for the latest news and updates